Wednesday, May 27, 2009

front elevation


rendering for the home is coming along. we've had several meetings with potential builders and are slowly coming to the decision. hopefully within the next two weeks we will of heard back from all builders and make the decision how to proceed. the process has definitely taken longer than expected; however, we have enjoyed each step so far.

Sunday, May 17, 2009

hanna rendering


we have an extremely talented friend who is helping on some renderings for our lampton house. this is the first rendering which will be imported to 3-D. eventually windows, brick, trees, paint, etc will be added...just like building a real home. for a glimpse at our friend's 3-D rendering talent, check out his website (http://www.ramyhanna.com/) or his blog (http://3dsmaxrendering.blogspot.com/)

Monday, May 4, 2009

finalized...design that is....



site plan, floor plan and elevations


well, we are finalized with our drawings. have the architect and engineer's stamp of approval. so what next? well, we are continuing to wait on two bids for the home. we have sent it to bid with a construction company that specializes in modern builds, and has a great sense of how to effectively execute the modern home. on the other hand, is a builder who has an extensive advantage in material purchase and experience in many new green building techniques including sip panels, spray insulation, and other materials. our tenant is moving out at the end of this week, which clears the way for ...clearing the lot. slowly but surely we are crawling forward. hopefully by June, we can be up and going...witha possible completion before summer 2010.
0

Friday, February 27, 2009

renderings

we are getting close to finalizing the design. here are some sketches of the courtyard area and also one of the living/dining/kitchen area. there still is a lot of decision to be made...both for things not seen (framing, insulation, hvac) and those things seen (siding, brick choice, finishes, appliances, etc.). literally thousands of choices to be made.

Tuesday, February 24, 2009

3rd draft computer schematics

here is the third iteration of our floor plan. things are coming together nicely. the master bath has been reconfigured, as well as the dimensions of the kitchen and study. also, the a/c work in the master closet has been reworked to keep the wall facing the entrance door clean. given the hard economic times, we are hoping that the lending will work out as planned a few months ago. if not, then it has been fun :) fingers crossed- and lord willing....

Tuesday, February 17, 2009

computer schematics

we just finished our markup of the computer generated floorplans and elevations. As you can see, the plan has been flipped. also, the general layout has changed slightly from the initial handrawn floorplan. there is a jack-n-jill bath configuration for the two smaller rooms in the back, the masterbath is not switched with the master closet. the master bathroom configuration is going to change from the above, and it should be incorporated in the next draft. the kitchen is being tweaked, as well as the roofline on the garage, and the layout of windows. we will have 25 ft beams running throughout the living space/dining space, which will look great. the beams will be somekind of engineered beams. also, there is talks of wrapping the ceiling in the living, dining, kitchen with either wood planks or sheets of maple, birch,etc. the living, dining, and kitchen will get hardwoods which will require the slab to be dropped about 2.5 inch es so that the installation of the wood floors with the tiles will be flush...without any kind of joints or edges. things are progressing and there is talk of breaking ground in march....we will see. next drafts should be back by the weeks end. [click on picture to enlarge]

Saturday, February 7, 2009

first round of floorplans

well, we had our first meeting with studioMET regarding the schematics of the home and the floorplan to the right is the result of our initial meeting. [click on picture to enlarge] when we started the process with studioMET we gave them a list of things we wanted in the home. some were specific, and some were just a list of feelings we wanted to evoke when someone comes to and into the home. we plan on flipping the floorplan horizontally so that the "C" formation faces east or up on the floorplan above. other features we like are the study that can turn to a 4th bedroom b/c it has a closet and a connected bathroom. also, we totally dig the carport. just for reference, the space of the kitchen, dining and living room is approximately 22x40 feet. for those that have been to our townhouse, it is roughly the size of our second floor but 6 feet wider. also, notice that the living, dining room has a wall of windows...probably sliding glass doors since fold-away windows (like nana walls) would thoroughly break the budget.

below is the list we initially came up with for the architect, let me know your thoughts on whether you think the design embodies our list:
~mid-century inspired design

~1 story~2500-3000 s.f.

~indoor/outdoor feeling

~courtyard feeling

~home that runs the depth of the lot

~at least 3 bedroom

~at least 3 full baths

~possibly a study that could convert to room if needed

~possibly a small sitting area

~main living space (kitchen, dinning, living room connected) towards back of home so you don't walk right into the main area from the front door

~master bedroom towards back of home

~large kitchen space

~low-slung roof

~stone/cmu on the front elevation

~possibly 3 car garage, or 2 car garage with carport

~exposed beams