This week saw the installation of the plumbing fixtures and cabinet hardware. these usually are installed later in the "game" since somehow these shiny things walk away pretty easily from the job site. the installation of the hafele tab hardware shows the detail of the mill work. each tab is slightly recessed so that the hardware sits flush with the mill work. the front door got a healthy dose of stain and poly. still mulling on the stain color...will have to give it some time to sink in. we will shortly have the master tub, fireplace and gate panels installed soon...so stay tuned.
Showing posts with label plumbing. Show all posts
Showing posts with label plumbing. Show all posts
Friday, July 9, 2010
Friday, July 2, 2010
its all in the details
its in the small things, the details, that make something truly interesting. with this house, there are several things that are incorporated that have made this process a joy. in the photo above the interior fire sprinkler actually uses a real bell. in this modern age, who in the world uses a real bell instead of a digital horn? additionally, there are door stops, walnut cabinetry and plumbing hardware that all have their own features. as these things are installed, the home is slowly being put together. the weather has not been very cooperative. with so much rain, the exterior sod and landscaping have taken a back seat. instead, the finished cabinetry is going in the kitchen and bath. this quarter-sawn walnut looks amazing. anyone agree? carpet has been on the agenda, and it is not an easy choice. berber? frieze? loop? who knows!!! let the fun/confusion keep rolling!
Thursday, January 28, 2010
top, side and pipes!
As you can see, we have several things progressing. the siding has landed and is in the process of being installed. we are doing about an 8" reveal to distinguish it from old-school siding. most of the siding will be on parts of the house that won't be seen as often. rough plumbing is going in as well. the rough valve for in-wall faucets are installed first. the whole home will be put together with copper pipes. also, the frame work for the sliding pocket doors just went in. the external doors have been delivered and will be framed/installed by weeks end. lastly, the roofing material has also arrived, and was in the midst of being installed this afternoon. hopefully it got done since a heavy pour is coming up tomorrow! the material we chose was 60 mil tpo manufactured by gaf everguard. this is usually a commercial application, but chose it due to its great lifespan, reflectivity, and ease of repair. this stuff can be found on flat roofs of shopping centers, hospitals and even stadiums!
Subscribe to:
Posts (Atom)