Finish work is happening inside the home. the trim and finish carpenters are working on the built-in shelving and closet casework. the carpenter is amazing, and is building and customizing all our closets. the study will have a wall of book shelves with built-in areas for stereo equipment and tv. the living room will have a floating walnut cabinet that is over 7' long. also, the laundry room lower and upper cabs and the secondary bedroom built-in dresser are looking amazing as well. with all the great progress, we had a brief set-back yesterday. we had some douche-bags break into the home and stole some plywood and materials. nothing worth too much, but they did destroy the framing of the doors, which need to be replaced. oh well, the driveway are awaiting some inspection before the pour, so it is just a holding pattern for now until it dries up (which won't happen until next week due to forecasted rain).....
Showing posts with label casework. Show all posts
Showing posts with label casework. Show all posts
Wednesday, April 21, 2010
Thursday, April 15, 2010
diggin' it up
time to beautify the site. the removal of the tree guard, and digging up the old driveway, the site now looks like a war zone. the flatwork forms are done, and after some tweaking, the rebar has gone down. hopefully, this thought of a landing strip-type driveway in my mind works well in reality. with the weather cooperating, the concrete will be poured sometime early next. additionally, the interior casework is going in. all the built-in closet casework is going in.
Subscribe to:
Posts (Atom)